Industrial

Project: HUB2, Tanjung Penjuru
Completion Date: March 2008

Factories with very hight floor heights pose a special challenge because the tiebacks need to be considered with more care in order to meet the requirements of the good and safe scaffolding.

Project: IMFS Phase 1 - FAB Building
Completion Date: April 2008

When IM Flash built it's Fabrication plant in Singapore, Transvert was there to provide access and support of its buildings. What we remember most was the heavy shoring reqired for it's heavy slabs. Safety requirements for this project were very stringent and we are proud to be part of this project.
Project: Chartered Semiconductor Manufacturing, FAB7C
Completion Date: May 2009


Project : Jurong Data Centre
Completion Date: Oct 2009


Project: Toshiba AFPD
Completion Date:

This was one of the big projects we started on  in the midst of the construction slowdown caused by the Asian Financial Crisis in 1997. It was an exciting project with the use of precast concrete starting to be vogue. Access systems needed to be fast paced and coordinated much quicker than conventional building methods. Use of many hoistable tower scaffolds marked the structural phase. Towards the end of the project, large material loading Birdcage scaffolds of heights of 40m were erected to take heavy roofing machines used for the roof sheeting. It was certainly a challenging project but one that Transvert is well positioned and equipped to handle.